GM Futurliner Progress Photos
GM Futurliner Restoration Project
National Automotive and Truck Museum of the United States

HOME
Status

Schedule
Photos:
2012 - 2011

2009 - 2010
2008 - 2007
2006 - 2005
2004 - 2003
2002 - 2001
2000 - 1999

With the door painted in its final primer it was ready to install. The first operation was to remove all the masking tape that was holding the plastic and paper protection to prevent over spray.  Don F. guided the door in place then he installed the hinge pins.

Next, the door was hoisted up with Ed DeVries driving his fork lift truck.

Don Feutz guides the door in place.

Don installs the hinge pins.

The rest of the Futurliner is masked off to protect it from overspray when the door is repainted.

Conrad DeJong works on the masking project.

The Futurliner is now masked off and ready for painting.

The restored Fisher Body Tags are reattached. 

Copyright 1999-2018. All rights reserved.