GM Futurliner Metalwork #3
GM Futurliner Restoration Project
National Automotive and Truck Museum of the United States

HOME
Locating
History #10
Relocation
Resto Begins
Disassembly
Lots of Rust
Components
Sand Blasting
New Barn

Electrical
Engine
Transmission
Shifter
Hubcaps
Tires
Roof
Bumper
Body
Interior
Dash
Drive Shaft
Differential
Gas Tank
Brakes
Metalwork
  Pg. #2
  Pg. #3

Photos:
2012 - 2011
2010 - 2009
2008 - 2007
2006 - 2005
2004 - 2003
2002 - 2001
2000 - 1999
Status

   
The pictures above show some of the framework and doors in the process of being refurbished. In these pictures they have been sand blasted and primed. Metal work still needs to be done however to restore them. The pictures on this page were taken in the Fall of 2000.


Bruce Beimers and Wes Myrick double-check the fit of the doors.


Jerry Sigler does some hand-cutting of metal on a cargo door.. 


Jerry Sigler looks on as Dick Saddler uses a magnifying glass for detail work.

Copyright 1999-2018. All rights reserved.