Wally fabricated at home two electrical junction boards to terminate
wiring at the bottom of the instrument panel. He then installed
these boards as well as started the process to connect wiring to
these panels. Stan (light blue) is assisting Wally (dark blue).
|
Wires are run from the junction boards to the instrument panel.
|
The front access doors were removed so that the wiring could be
completed without being cramped.
|
|
Don Mayton solders wires together at the rear of the Futurliner for
15 of the lower running lights.
|
The men are beginning the process of of installing weather seals on
all of the doors.
|